๐ŸProject Closed๐Ÿ”ง Additions to Existing Building๐Ÿ’ต This project is privately funded, on private land for private use.

FELLOWSHIP HALL

411 COUNTY ROAD 401, Taylor, TX 76574, Taylor, TX, 76574
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB4811835
$1.0M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
6 months
Duration
Registered:Mar 26, 2014
Start:Jun 1, 2014
Target:Dec 1, 2014
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

New building addition with fellowship hall, kitchen, conference room, activity rooms, nursery and restrooms. Bui

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
March 26, 2014
Project Closed
December 1, 2014
Construction Start
June 1, 2014
Expected Completion
December 1, 2014

๐Ÿ“Location & Views

Open in MapsGet Directions|30.55256, -97.45295

๐Ÿ“„Related City Permits

Building permits found at or near this location

4119 HONEYCOMB ROCK CIR
22.73 mi away

Tunnel under the home to replace existing cast iron sewer piping with PVC. Work includes repiping all master bathroom fixtures (2 lavatories 1 toilet 1 shower) and approximately 65 feet of piping toward the kitchen.

ActivePlumbing PermitRepairFeb 2026
View Details
2026-012217 PP
๐Ÿ”งCold Is On The Right
4114 RED RIVER ST
23.68 mi away

2026/02/21 | (2026/02/17) | This is a private wedding at the Commodore Perry Estate venue 4100 Red River St Austin 78751. We will be putting up a platform and tent for the event. In the tent there will be dinner served and then a wedding reception. This project consists of the installation of a temporary elevated platform and 50ยฟ x 120ยฟ clear-span structure tent within the Sunken Garden at the Commodore Perry Estate for a private wedding event hosting approximately 170 guests. The event will take place on Saturday February 21 from 3:00 PM to 11:00 PM. Installation will begin Wednesday February 18 at 9:00 AM. Work will commence with construction of the full elevated flooring system. The platform will be constructed using ring-lock scaffolding with screw jacks and base plates supporting 6x6 wood beams and ยฟยฟ plywood decking with a vinyl overlay finish. Due to existing site slope platform elevation will vary from approximately 12 inches at the northeast corner to approximately 24 inches at the southwest corner. Heating ducts will be routed beneath the platform and will not penetrate tent walls. Stairs will be installed at both the front and rear of the structure to provide primary and secondary egress. An ADA-accessible ramp will be installed along the left (mansion-facing) side of the platform to accommodate guests and service access. On Thursday February 19 flooring installation will continue and the structure tent frame and top will be installed. On Friday February 20 final detailing and installation will be completed with 100% turnover to the client by 12:00 PM to allow vendor load-in. The tent will be anchored using engineered concrete ballast blocks. No permanent foundations or ground penetrations are proposed. The structure is fully temporary and will be removed during a two-day strike on Sunday February 22 and Monday February 23.

ActiveBuilding PermitNewFeb 2026
View Details
2026-018480 BP
๐Ÿ”งWhim Hospitality
4114 RED RIVER ST
23.68 mi away

2026/02/21 | (2026/02/17) | This is a private wedding at the Commodore Perry Estate venue 4100 Red River St Austin 78751. We will be putting up a platform and tent for the event. In the tent there will be dinner served and then a wedding reception. This project consists of the installation of a temporary elevated platform and 50ยฟ x 120ยฟ clear-span structure tent within the Sunken Garden at the Commodore Perry Estate for a private wedding event hosting approximately 170 guests. The event will take place on Saturday February 21 from 3:00 PM to 11:00 PM. Installation will begin Wednesday February 18 at 9:00 AM. Work will commence with construction of the full elevated flooring system. The platform will be constructed using ring-lock scaffolding with screw jacks and base plates supporting 6x6 wood beams and ยฟยฟ plywood decking with a vinyl overlay finish. Due to existing site slope platform elevation will vary from approximately 12 inches at the northeast corner to approximately 24 inches at the southwest corner. Heating ducts will be routed beneath the platform and will not penetrate tent walls. Stairs will be installed at both the front and rear of the structure to provide primary and secondary egress. An ADA-accessible ramp will be installed along the left (mansion-facing) side of the platform to accommodate guests and service access. On Thursday February 19 flooring installation will continue and the structure tent frame and top will be installed. On Friday February 20 final detailing and installation will be completed with 100% turnover to the client by 12:00 PM to allow vendor load-in. The tent will be anchored using engineered concrete ballast blocks. No permanent foundations or ground penetrations are proposed. The structure is fully temporary and will be removed during a two-day strike on Sunday February 22 and Monday February 23.

ActiveBuilding PermitNewFeb 2026
View Details
2026-018489 BP
๐Ÿ”งWhim Hospitality
4113 IDLEWILD RD
24.16 mi away

Install new roof-mounted solar system and energy storage system to existing single family residence. Overhead AE

ActiveElectrical PermitAuxiliary PowerJan 2026
View Details
2026-004784 EP
๐Ÿ”งTesla Energy Operations, Inc.
4113 IDLEWILD RD
24.16 mi away

Utility disconnect/reconnect. Tesla Gateway. Overhead service. AE. Meter Can does not need replacing- NO ESPA attached

ActiveElectrical PermitRepairJan 2026
View Details
2026-004798 EP
๐Ÿ”งTesla Energy Operations, Inc.

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists