SH 21
SH 21 is a new construction project at SH 21 & US 96, San Augustine, in San Augustine County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2015). The project has an estimated value of $52K.
๐Project Metrics
TDLR #EABPRJB4814941Project Closed
Project has been completed and closed
SH 21 is a New Construction project located at SH 21 & US 96, San Augustine, TX 75972 in San Augustine, Texas. The project has an estimated value of $52K. TXDOT DISTRICT: LUFKIN is the property owner and TXDOT DISTRICT: LUFKIN is the design firm of record. The project was registered with TDLR on May 12, 2014.
โFrequently Asked Questions
What is SH 21?
SH 21 is a new construction project at SH 21 & US 96 in San Augustine, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of traffic signal, curb and gutter, sidewalk and accessible ramps
Is SH 21 open in San Augustine?
Construction on SH 21 is complete โ TDLR records show the project passed its required accessibility inspection in May 2015. The building is finished and very likely open.
Where is SH 21 located?
SH 21 is located at SH 21 & US 96, San Augustine, TX, 75972, in San Augustine County.
Who is the owner or developer of SH 21?
TXDOT DISTRICT: LUFKIN is the property owner/developer of record for SH 21, per its TDLR project registration.
Who is the architect or design firm for SH 21?
TXDOT DISTRICT: LUFKIN is the design firm of record for SH 21, according to its TDLR filing.
How much does SH 21 cost and how big is it?
SH 21 has an estimated construction value of $52K, based on its TDLR filing.
๐Scope of Work
Installation of traffic signal, curb and gutter, sidewalk and accessible ramps
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 12, 2014
Review Complete
Inspection Complete
Closed
May 1, 2015
๐Related Projects
๐คSame Owner
$37.03B total๐๏ธSame Design Firm
$37.03B total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in San Augustine County
Find General Contractors in San Augustine