ELTRON CORP.
ELTRON CORP. is a renovation/alteration project at 5151 SAN FELIPE Suite 1480, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2014). The project has an estimated value of $75K.
๐Project Metrics
TDLR #EABPRJB4815401Project Closed
Project has been completed and closed
ELTRON CORP. is a Renovation/Alteration project located at 5151 SAN FELIPE Suite 1480, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $75K. GRANITE BARNHART SAGE PLAZA LLC is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on May 19, 2014.
โFrequently Asked Questions
What is ELTRON CORP.?
ELTRON CORP. is a renovation/alteration project at 5151 SAN FELIPE Suite 1480 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation
Is ELTRON CORP. open in Houston?
Construction on ELTRON CORP. is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2014. The building is finished and very likely open.
Where is ELTRON CORP. located?
ELTRON CORP. is located at 5151 SAN FELIPE Suite 1480, Houston, TX, 77056, in Harris County.
Who is the owner or developer of ELTRON CORP.?
GRANITE BARNHART SAGE PLAZA LLC is the property owner/developer of record for ELTRON CORP., per its TDLR project registration.
Who is the architect or design firm for ELTRON CORP.?
ABEL DESIGN GROUP is the design firm of record for ELTRON CORP., according to its TDLR filing.
How much does ELTRON CORP. cost and how big is it?
ELTRON CORP. has an estimated construction value of $75K, based on its TDLR filing.
๐Scope of Work
Interior Renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 19, 2014
Review Complete
Inspection Complete
Closed
Aug 1, 2014