Project has been completed and closed
NITRO SWIM CENTER is a New Construction project located at 1301 TORO GRANDE BLVD., Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $3.0M. TRACY KOLEBER is the property owner and RUNA WORKSHOP is the design firm of record. The project was registered with TDLR on June 2, 2014.
15,100 sf Aquatics facility with indoor swimming pools for child lessons with parent viewing area and administra
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 2, 2014
Review Complete
Inspection Complete
Closed
Aug 1, 2015
Building permits found at or near this location
New pool with required enclosure and concrete deck (heater or autofill)
Express: Foundation Repair
Replacement of an existing water heater water heater change out 13017 Perconte Drive Del Valle TX 78617
QT - Install new 376.42 kWDC rooftop solar system to commercial only - OVA
QT - Install new 376.42 kWDC rooftop solar system to commercial only - OVA
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson