TIME WARNER CABLE
TIME WARNER CABLE is a renovation/alteration project at 200 UNIVERSITY BLVD. Suite 610, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2014). The project has an estimated value of $400K.
๐Project Metrics
TDLR #EABPRJB4817753Project Closed
Project has been completed and closed
TIME WARNER CABLE is a Renovation/Alteration project located at 200 UNIVERSITY BLVD. Suite 610, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $400K. CHANDLER IH 35 RETAIL LTD is the property owner and WARE MALCOMB is the design firm of record. The project was registered with TDLR on June 25, 2014.
โFrequently Asked Questions
What is TIME WARNER CABLE?
TIME WARNER CABLE is a renovation/alteration project at 200 UNIVERSITY BLVD. Suite 610 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Improvement
Is TIME WARNER CABLE open in Round Rock?
Construction on TIME WARNER CABLE is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2014. The building is finished and very likely open.
Where is TIME WARNER CABLE located?
TIME WARNER CABLE is located at 200 UNIVERSITY BLVD. Suite 610, Round Rock, TX, 78665, in Williamson County.
Who is the owner or developer of TIME WARNER CABLE?
CHANDLER IH 35 RETAIL LTD is the property owner/developer of record for TIME WARNER CABLE, per its TDLR project registration.
Who is the architect or design firm for TIME WARNER CABLE?
WARE MALCOMB is the design firm of record for TIME WARNER CABLE, according to its TDLR filing.
How much does TIME WARNER CABLE cost and how big is it?
TIME WARNER CABLE has an estimated construction value of $400K, based on its TDLR filing.
๐Scope of Work
Tenant Improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 25, 2014
Review Complete
Inspection Complete
Closed
Oct 1, 2014
๐Related Projects
๐คSame Owner
$1.5M total๐Related City Permits
Building permits found at or near this location
ePlan - Expedited Review: [APPROVED] *SMART HOUSING* Finish-Out for Floor 7 - Phase 3 (23540 SF).
2026/08/15 | (2026/08/14) | Road to Lonestar Le Mans - Free community event showcasing edurance Le Mans racing prior to the race at COTA on 9/6. Majority of all of our event displays are inside Branch Park Pavilion but we would also like to add an outdoor LED screen and some seating to the Branch park area which came with our rental of the Pavilion.
Addition/ remodel to existing 1-story single-family residential to include: convert existing garage to be bedroom; addition of a dining room new small additions to simplify building forms relocate and remodel kitchen relocate and remodel bathroom new roof new front and side porch configurations new full bath & half bath.
*Partial demo* Addition/ interior remodel to existing duplex to include: addition to 1930s historic house to be demolished 1930s house to remain and be remodeled new construction of 2 story wood framed addition to back of 1930s house w 2nd unit above garage. 1st unit: 5 bedroom 3.5 bath w/ attached 2-car garage covered front porch and rear screened porch.
Construct new driveway approach of 12 FT. Driveway approach is from the alley.