SAN SABA WALLACE STREET SIDEWALK PHASE 2
SAN SABA WALLACE STREET SIDEWALK PHASE 2 is a renovation/alteration project at 316 E. WALLACE, San Saba, in San Saba County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2015). The project has an estimated value of $100K.
๐Project Metrics
TDLR #EABPRJB4817829Project Closed
Project has been completed and closed
SAN SABA WALLACE STREET SIDEWALK PHASE 2 is a Renovation/Alteration project located at 316 E. WALLACE, San Saba, TX 76877 in San Saba, Texas. The project has an estimated value of $100K. CITY OF SAN SABA is the property owner and JACOB AND MARTIN LTD. is the design firm of record. The project was registered with TDLR on June 26, 2014.
โFrequently Asked Questions
What is SAN SABA WALLACE STREET SIDEWALK PHASE 2?
SAN SABA WALLACE STREET SIDEWALK PHASE 2 is a renovation/alteration project at 316 E. WALLACE in San Saba, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace existing sidewalk on the south side of the 400thblock of Wallace Street.
Is SAN SABA WALLACE STREET SIDEWALK PHASE 2 open in San Saba?
Construction on SAN SABA WALLACE STREET SIDEWALK PHASE 2 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2015. The building is finished and very likely open.
Where is SAN SABA WALLACE STREET SIDEWALK PHASE 2 located?
SAN SABA WALLACE STREET SIDEWALK PHASE 2 is located at 316 E. WALLACE, San Saba, TX, 76877, in San Saba County.
Who is the owner or developer of SAN SABA WALLACE STREET SIDEWALK PHASE 2?
CITY OF SAN SABA is the property owner/developer of record for SAN SABA WALLACE STREET SIDEWALK PHASE 2, per its TDLR project registration.
Who is the architect or design firm for SAN SABA WALLACE STREET SIDEWALK PHASE 2?
JACOB AND MARTIN LTD. is the design firm of record for SAN SABA WALLACE STREET SIDEWALK PHASE 2, according to its TDLR filing.
How much does SAN SABA WALLACE STREET SIDEWALK PHASE 2 cost and how big is it?
SAN SABA WALLACE STREET SIDEWALK PHASE 2 has an estimated construction value of $100K, based on its TDLR filing.
๐Scope of Work
Replace existing sidewalk on the south side of the 400thblock of Wallace Street.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 26, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2015