OPTUM - LEVEL 9
OPTUM - LEVEL 9 is a renovation/alteration project at 2000 WEST LOOP SOUTH Level 9, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2015). The project has an estimated value of $297K.
๐Project Metrics
TDLR #EABPRJB4818019Project Closed
Project has been completed and closed
OPTUM - LEVEL 9 is a Renovation/Alteration project located at 2000 WEST LOOP SOUTH Level 9, Houston, TX 77027 in Houston, Texas. The project has an estimated value of $297K. JONES LANG LA SALLE AMERIACS INC is the property owner and RSP ARCHITECTS LTD is the design firm of record. The project was registered with TDLR on July 1, 2014.
โFrequently Asked Questions
What is OPTUM - LEVEL 9?
OPTUM - LEVEL 9 is a renovation/alteration project at 2000 WEST LOOP SOUTH Level 9 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of business office space on floor 9
Is OPTUM - LEVEL 9 open in Houston?
Construction on OPTUM - LEVEL 9 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2015. The building is finished and very likely open.
Where is OPTUM - LEVEL 9 located?
OPTUM - LEVEL 9 is located at 2000 WEST LOOP SOUTH Level 9, Houston, TX, 77027, in Harris County.
Who is the owner or developer of OPTUM - LEVEL 9?
JONES LANG LA SALLE AMERIACS INC is the property owner/developer of record for OPTUM - LEVEL 9, per its TDLR project registration.
Who is the architect or design firm for OPTUM - LEVEL 9?
RSP ARCHITECTS LTD is the design firm of record for OPTUM - LEVEL 9, according to its TDLR filing.
How much does OPTUM - LEVEL 9 cost and how big is it?
OPTUM - LEVEL 9 has an estimated construction value of $297K, based on its TDLR filing.
๐Scope of Work
Remodel of business office space on floor 9
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 1, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2015