TULCAN
TULCAN is a renovation/alteration project at 2001 KIRBY DR. Suite 1300, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2014). The project has an estimated value of $230K.
๐Project Metrics
TDLR #EABPRJB4819090Project Closed
Project has been completed and closed
TULCAN is a Renovation/Alteration project located at 2001 KIRBY DR. Suite 1300, Houston, TX 77019 in Houston, Texas. The project has an estimated value of $230K. 2001 KIRBY BUILDING INC is the property owner and ABEL DESIGN GROUP is the design firm of record. The project was registered with TDLR on July 17, 2014.
โFrequently Asked Questions
What is TULCAN?
TULCAN is a renovation/alteration project at 2001 KIRBY DR. Suite 1300 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Minor renovation of existing suite as needed for maintenance and asbestos abatement.
Is TULCAN open in Houston?
Construction on TULCAN is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2014. The building is finished and very likely open.
Where is TULCAN located?
TULCAN is located at 2001 KIRBY DR. Suite 1300, Houston, TX, 77019, in Harris County.
Who is the owner or developer of TULCAN?
2001 KIRBY BUILDING INC is the property owner/developer of record for TULCAN, per its TDLR project registration.
Who is the architect or design firm for TULCAN?
ABEL DESIGN GROUP is the design firm of record for TULCAN, according to its TDLR filing.
How much does TULCAN cost and how big is it?
TULCAN has an estimated construction value of $230K, based on its TDLR filing.
๐Scope of Work
Minor renovation of existing suite as needed for maintenance and asbestos abatement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 17, 2014
Review Complete
Inspection Complete
Closed
Dec 1, 2014