TRAVELEX
TRAVELEX is a renovation/alteration project at 3200 E. AIRFIELD DRIVE D-2-DCX1, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2014). The project has an estimated value of $116K.
๐Project Metrics
TDLR #EABPRJB5801101Project Closed
Project has been completed and closed
TRAVELEX is a Renovation/Alteration project located at 3200 E. AIRFIELD DRIVE D-2-DCX1, Dallas, TX 75261 in Dallas, Texas. The project has an estimated value of $116K. TRAVELEX CURRENCY SERVICES INC is the property owner and ARCVISION INC is the design firm of record. The project was registered with TDLR on September 18, 2014.
โFrequently Asked Questions
What is TRAVELEX?
TRAVELEX is a renovation/alteration project at 3200 E. AIRFIELD DRIVE D-2-DCX1 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel to existing currency exchange
Is TRAVELEX open in Dallas?
Construction on TRAVELEX is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2014. The building is finished and very likely open.
Where is TRAVELEX located?
TRAVELEX is located at 3200 E. AIRFIELD DRIVE D-2-DCX1, Dallas, TX, 75261, in Dallas County.
Who is the owner or developer of TRAVELEX?
TRAVELEX CURRENCY SERVICES INC is the property owner/developer of record for TRAVELEX, per its TDLR project registration.
Who is the architect or design firm for TRAVELEX?
ARCVISION INC is the design firm of record for TRAVELEX, according to its TDLR filing.
How much does TRAVELEX cost and how big is it?
TRAVELEX has an estimated construction value of $116K, based on its TDLR filing.
๐Scope of Work
Remodel to existing currency exchange
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 18, 2014
Review Complete
Inspection Complete
Closed
Dec 1, 2014