HEB ROUND ROCK 3 FUEL KIOSK
HEB ROUND ROCK 3 FUEL KIOSK is a renovation/alteration project at 603 LOUIS HENNA BLVD, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $90K across about 100 sq ft.
๐Project Metrics
TDLR #EABPRJB5801155Review Complete
Design review complete, construction may proceed
HEB ROUND ROCK 3 FUEL KIOSK is a Renovation/Alteration project located at 603 LOUIS HENNA BLVD, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $90K covering 100 sq ft. HEB GROCERY COMPANY LP is the property owner and BURY SA-INC. is the design firm of record. The project was registered with TDLR on September 18, 2014.
โFrequently Asked Questions
What is HEB ROUND ROCK 3 FUEL KIOSK?
HEB ROUND ROCK 3 FUEL KIOSK is a renovation/alteration project at 603 LOUIS HENNA BLVD in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Work consists of removal of a small building associatedwith the fuel station. A pre-manufactured replacement bu
Is HEB ROUND ROCK 3 FUEL KIOSK open in Round Rock?
HEB ROUND ROCK 3 FUEL KIOSK is currently under construction in Round Rock, TX. Its current TDLR status is "Review Complete".
Where is HEB ROUND ROCK 3 FUEL KIOSK located?
HEB ROUND ROCK 3 FUEL KIOSK is located at 603 LOUIS HENNA BLVD, Round Rock, TX, 78664, in Williamson County.
Who is the owner or developer of HEB ROUND ROCK 3 FUEL KIOSK?
HEB GROCERY COMPANY LP is the property owner/developer of record for HEB ROUND ROCK 3 FUEL KIOSK, per its TDLR project registration.
Who is the architect or design firm for HEB ROUND ROCK 3 FUEL KIOSK?
BURY SA-INC. is the design firm of record for HEB ROUND ROCK 3 FUEL KIOSK, according to its TDLR filing.
How much does HEB ROUND ROCK 3 FUEL KIOSK cost and how big is it?
HEB ROUND ROCK 3 FUEL KIOSK has an estimated construction value of $90K and approximately 100 square feet (about $900/sqft), based on its TDLR filing.
๐Scope of Work
Work consists of removal of a small building associatedwith the fuel station. A pre-manufactured replacement bu
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 18, 2014
Review Complete
Sep 18, 2014
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$5.19B total๐๏ธSame Design Firm
$340K total๐Related City Permits
Building permits found at or near this location
Excavate 18 tunnel to repair main drain line under the house.
Temporary power panel ref: 2025 091605 BP
New construction single-family residential 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch covered rear patio. uncovered wood deck and 2nd floor balcony.
Replacement of complete existing central heat and air system with or without duct work
EXPRESS: Foundation repair