KROGER 544
KROGER 544 is a renovation/alteration project at 1212 E. BETHANY DRIVE, Allen, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2015). The project has an estimated value of $1.3M.
๐Project Metrics
TDLR #EABPRJB5802245Project Closed
Project has been completed and closed
KROGER 544 is a Renovation/Alteration project located at 1212 E. BETHANY DRIVE, Allen, TX 75034 in Allen, Texas. The project has an estimated value of $1.3M. KROGER TEXAS LIMITED PARTNERSHIP is the property owner and O'BRIEN AND ASSOC. is the design firm of record. The project was registered with TDLR on October 6, 2014.
โFrequently Asked Questions
What is KROGER 544?
KROGER 544 is a renovation/alteration project at 1212 E. BETHANY DRIVE in Allen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of an existing Kroger store
Is KROGER 544 open in Allen?
Construction on KROGER 544 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2015. The building is finished and very likely open.
Where is KROGER 544 located?
KROGER 544 is located at 1212 E. BETHANY DRIVE, Allen, TX, 75034, in Collin County.
Who is the owner or developer of KROGER 544?
KROGER TEXAS LIMITED PARTNERSHIP is the property owner/developer of record for KROGER 544, per its TDLR project registration.
Who is the architect or design firm for KROGER 544?
O'BRIEN AND ASSOC. is the design firm of record for KROGER 544, according to its TDLR filing.
How much does KROGER 544 cost and how big is it?
KROGER 544 has an estimated construction value of $1.3M, based on its TDLR filing.
๐Scope of Work
Interior remodel of an existing Kroger store
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 6, 2014
Review Complete
Inspection Complete
Closed
Apr 1, 2015