FY2014-2015 STREET & SIDEWALK is a renovation/alteration project at VARIOUS, Bellaire, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2015). The project has an estimated value of $1.1M.
Project has been completed and closed
FY2014-2015 STREET & SIDEWALK is a Renovation/Alteration project located at VARIOUS, Bellaire, TX 77401 in Bellaire, Texas. The project has an estimated value of $1.1M. CITY OF BELLAIRE is the property owner and ARKK ENGINEERS LLC is the design firm of record. The project was registered with TDLR on October 31, 2014.
FY2014-2015 STREET & SIDEWALK is a renovation/alteration project at VARIOUS in Bellaire, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Concrete Pavement, Asphalt Overlay, Concrete Sidewalk-Propsed -Remove & Replace
Construction on FY2014-2015 STREET & SIDEWALK is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2015. The building is finished and very likely open.
FY2014-2015 STREET & SIDEWALK is located at VARIOUS, Bellaire, TX, 77401, in Harris County.
CITY OF BELLAIRE is the property owner/developer of record for FY2014-2015 STREET & SIDEWALK, per its TDLR project registration.
ARKK ENGINEERS LLC is the design firm of record for FY2014-2015 STREET & SIDEWALK, according to its TDLR filing.
FY2014-2015 STREET & SIDEWALK has an estimated construction value of $1.1M, based on its TDLR filing.
Concrete Pavement, Asphalt Overlay, Concrete Sidewalk-Propsed -Remove & Replace
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 31, 2014
Review Complete
Inspection Complete
Closed
Aug 1, 2015