DR. CHRIS HOLLAND
DR. CHRIS HOLLAND is a renovation/alteration project at 7902 JONES MALTSBERGER, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2015). The project has an estimated value of $411K.
๐Project Metrics
TDLR #EABPRJB5805469Project Closed
Project has been completed and closed
DR. CHRIS HOLLAND is a Renovation/Alteration project located at 7902 JONES MALTSBERGER, San Antonio, TX 78216 in San Antonio, Texas. The project has an estimated value of $411K. CHRISTOPHER ISLAND is the property owner and MED TECH CONSTRUCTION is the design firm of record. The project was registered with TDLR on November 24, 2014.
โFrequently Asked Questions
What is DR. CHRIS HOLLAND?
DR. CHRIS HOLLAND is a renovation/alteration project at 7902 JONES MALTSBERGER in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: REMODEL TO A DENTAL OFFICE.
Is DR. CHRIS HOLLAND open in San Antonio?
Construction on DR. CHRIS HOLLAND is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2015. The building is finished and very likely open.
Where is DR. CHRIS HOLLAND located?
DR. CHRIS HOLLAND is located at 7902 JONES MALTSBERGER, San Antonio, TX, 78216, in Bexar County.
Who is the owner or developer of DR. CHRIS HOLLAND?
CHRISTOPHER ISLAND is the property owner/developer of record for DR. CHRIS HOLLAND, per its TDLR project registration.
Who is the architect or design firm for DR. CHRIS HOLLAND?
MED TECH CONSTRUCTION is the design firm of record for DR. CHRIS HOLLAND, according to its TDLR filing.
How much does DR. CHRIS HOLLAND cost and how big is it?
DR. CHRIS HOLLAND has an estimated construction value of $411K, based on its TDLR filing.
๐Scope of Work
REMODEL TO A DENTAL OFFICE.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 24, 2014
Review Complete
Inspection Complete
Closed
Mar 1, 2015