STORAGE CENTER
๐Project Metrics
TDLR #EABPRJB5805531Project Closed
Project has been completed and closed
๐Scope of Work
Addition to existing storage facility consisting of 3 single story buildings and integrated office, all of 80,90
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$11.8M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replace current system with new 3 ton and 3.5 ton single stage Goodman system. New GLXS4 condenser and horizontal coil on R32 refrigerant with GR9S furnace.
Install 1-20A 2-pole circuit from existing Pano breaker box to Pano UPS. Install UPS and grounding.
Whole house water re-pipe and replace the water heater. Approximately 75 square feet of drywall removed. No tunneling. Water line re-pipe only.
Interior Remodel - Remodeling kitchen moving the sink and the range oven. Remodeling master bathroom. Tile new vanity and shower top. Living Room update the fireplace with new granite and shelves
ATT is proposing to install on tower: (1) Mount modification with no change of tower height (3) new radio/antenna units (3) new radios (3) dual radio brackets. Ground installation: (5) DC converters (1) Battery rack (12) 170AH batteries (4) Base band unit BBU (1) XMU (3) 200A breakers (6) DC breakers. No change of tower height nor ground disturbance