ASPEN DENTAL
ASPEN DENTAL is a renovation/alteration project at 4251 SUNSET DRIVE, San Angelo, in Tom Green County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2015). The project has an estimated value of $160K.
๐Project Metrics
TDLR #EABPRJB5807265Project Closed
Project has been completed and closed
ASPEN DENTAL is a Renovation/Alteration project located at 4251 SUNSET DRIVE, San Angelo, TX 76903 in San Angelo, Texas. The project has an estimated value of $160K. SHANNON HEALTH is the property owner and EXCEL ENGINEERING INC. is the design firm of record. The project was registered with TDLR on December 24, 2014.
โFrequently Asked Questions
What is ASPEN DENTAL?
ASPEN DENTAL is a renovation/alteration project at 4251 SUNSET DRIVE in San Angelo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant build out for dental office.
Is ASPEN DENTAL open in San Angelo?
Construction on ASPEN DENTAL is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2015. The building is finished and very likely open.
Where is ASPEN DENTAL located?
ASPEN DENTAL is located at 4251 SUNSET DRIVE, San Angelo, TX, 76903, in Tom Green County.
Who is the owner or developer of ASPEN DENTAL?
SHANNON HEALTH is the property owner/developer of record for ASPEN DENTAL, per its TDLR project registration.
Who is the architect or design firm for ASPEN DENTAL?
EXCEL ENGINEERING INC. is the design firm of record for ASPEN DENTAL, according to its TDLR filing.
How much does ASPEN DENTAL cost and how big is it?
ASPEN DENTAL has an estimated construction value of $160K, based on its TDLR filing.
๐Scope of Work
Interior tenant build out for dental office.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 24, 2014
Review Complete
Inspection Complete
Closed
Mar 1, 2015