GULFSIDE DENTAL
GULFSIDE DENTAL is a renovation/alteration project at 6026 SEAWALL BLVD SUITE B, Galveston, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2015). The project has an estimated value of $267K.
๐Project Metrics
TDLR #EABPRJB5808442Project Closed
Project has been completed and closed
GULFSIDE DENTAL is a Renovation/Alteration project located at 6026 SEAWALL BLVD SUITE B, Galveston, TX 77551 in Galveston, Texas. The project has an estimated value of $267K. KOLA COVE INC is the property owner and CAMDEN DESIGN GROUP is the design firm of record. The project was registered with TDLR on January 20, 2015.
โFrequently Asked Questions
What is GULFSIDE DENTAL?
GULFSIDE DENTAL is a renovation/alteration project at 6026 SEAWALL BLVD SUITE B in Galveston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR FINISH OUT OF EXISTING LEASE SPACE FOR NEW DENTAL CLINIC
Is GULFSIDE DENTAL open in Galveston?
Construction on GULFSIDE DENTAL is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2015. The building is finished and very likely open.
Where is GULFSIDE DENTAL located?
GULFSIDE DENTAL is located at 6026 SEAWALL BLVD SUITE B, Galveston, TX, 77551, in Galveston County.
Who is the owner or developer of GULFSIDE DENTAL?
KOLA COVE INC is the property owner/developer of record for GULFSIDE DENTAL, per its TDLR project registration.
Who is the architect or design firm for GULFSIDE DENTAL?
CAMDEN DESIGN GROUP is the design firm of record for GULFSIDE DENTAL, according to its TDLR filing.
How much does GULFSIDE DENTAL cost and how big is it?
GULFSIDE DENTAL has an estimated construction value of $267K, based on its TDLR filing.
๐Scope of Work
INTERIOR FINISH OUT OF EXISTING LEASE SPACE FOR NEW DENTAL CLINIC
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 20, 2015
Review Complete
Inspection Complete
Closed
Apr 1, 2015