NEXT LEVEL RIDE
NEXT LEVEL RIDE is a new construction project at 5400 EAST STATE HIGHWAY 71, Del Valle, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2015). The project has an estimated value of $378K.
๐Project Metrics
TDLR #EABPRJB5810693Project Closed
Project has been completed and closed
NEXT LEVEL RIDE is a New Construction project located at 5400 EAST STATE HIGHWAY 71, Del Valle, TX 78617 in Del Valle, Texas. The project has an estimated value of $378K. SOKO LIFE LLC is the property owner and NIX GROUP ARCHITECTS is the design firm of record. The project was registered with TDLR on February 25, 2015.
โFrequently Asked Questions
What is NEXT LEVEL RIDE?
NEXT LEVEL RIDE is a new construction project at 5400 EAST STATE HIGHWAY 71 in Del Valle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Pre-Engineered Metal Building for Mercantile Occupancy
Is NEXT LEVEL RIDE open in Del Valle?
Construction on NEXT LEVEL RIDE is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2015. The building is finished and very likely open.
Where is NEXT LEVEL RIDE located?
NEXT LEVEL RIDE is located at 5400 EAST STATE HIGHWAY 71, Del Valle, TX, 78617, in Travis County.
Who is the owner or developer of NEXT LEVEL RIDE?
SOKO LIFE LLC is the property owner/developer of record for NEXT LEVEL RIDE, per its TDLR project registration.
Who is the architect or design firm for NEXT LEVEL RIDE?
NIX GROUP ARCHITECTS is the design firm of record for NEXT LEVEL RIDE, according to its TDLR filing.
How much does NEXT LEVEL RIDE cost and how big is it?
NEXT LEVEL RIDE has an estimated construction value of $378K, based on its TDLR filing.
๐Scope of Work
Pre-Engineered Metal Building for Mercantile Occupancy
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 25, 2015
Review Complete
Inspection Complete
Closed
Sep 1, 2015
๐Related Projects
๐๏ธSame Design Firm
$1.7M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
60 trench to replace yard sewer. Access up and under pier and beam foundation to replace cast iron drain lines
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Horizontal Gas System
Install Level 2 EV Charger
Contractor will be replacing the meter jaws in a meter that is powering an apartment unit and the service disconnect. No ESPA needed due to meter can not being replaced-Hyatt This is an emergency permit pull. there is a safety concern and will require the permit to be made by Friday morning.
Property Owner
Design Firm
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis