Project has been completed and closed
RRMC - HYBRID OR is a Renovation/Alteration project located at 2400 ROUND ROCK AVENUE, Round Rock, TX 78681 in Round Rock, Texas. The project has an estimated value of $846K. ST. DAVID'S ROUND ROCK MEDICAL CENTER is the property owner and WILLIAM DAVIES is the design firm of record. The project was registered with TDLR on March 12, 2015.
Renovation of Hospital to add Hybrid Operating Room, Work Room, Sub-sterile, General Storage, Restroom and Janit
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Mar 12, 2015
Review Complete
Inspection Complete
Closed
Jun 1, 2015
Building permits found at or near this location
Express: Foundation repair
Commercial rooftop Solar installation 770.18 kw DC.
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Update 6/1/26 LS- 2 phase project. Both bathrooms are being remodel. GC will complete primary bathroom and then call in inspections for second guest bathroom. Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location