PIE FIVE PIZZA
PIE FIVE PIZZA is a renovation/alteration project at KELLER SMITH RD @ KELLER PARKW, Keller, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2015). The project has an estimated value of $180K.
๐Project Metrics
TDLR #EABPRJB5811899Project Closed
Project has been completed and closed
PIE FIVE PIZZA is a Renovation/Alteration project located at KELLER SMITH RD @ KELLER PARKW, Keller, TX 76248 in Keller, Texas. The project has an estimated value of $180K. GREENWAY-KELLER LP is the property owner and ID STUDIO 4 is the design firm of record. The project was registered with TDLR on March 17, 2015.
โFrequently Asked Questions
What is PIE FIVE PIZZA?
PIE FIVE PIZZA is a renovation/alteration project at KELLER SMITH RD @ KELLER PARKW in Keller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out for a fast casual pizza restaurant with new bathrooms and kitchen
Is PIE FIVE PIZZA open in Keller?
Construction on PIE FIVE PIZZA is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2015. The building is finished and very likely open.
Where is PIE FIVE PIZZA located?
PIE FIVE PIZZA is located at KELLER SMITH RD @ KELLER PARKW, Keller, TX, 76248, in Tarrant County.
Who is the owner or developer of PIE FIVE PIZZA?
GREENWAY-KELLER LP is the property owner/developer of record for PIE FIVE PIZZA, per its TDLR project registration.
Who is the architect or design firm for PIE FIVE PIZZA?
ID STUDIO 4 is the design firm of record for PIE FIVE PIZZA, according to its TDLR filing.
How much does PIE FIVE PIZZA cost and how big is it?
PIE FIVE PIZZA has an estimated construction value of $180K, based on its TDLR filing.
๐Scope of Work
Tenant finish out for a fast casual pizza restaurant with new bathrooms and kitchen
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 17, 2015
Review Complete
Inspection Complete
Closed
Jun 1, 2015