PILLOW ELEMENTARY
๐Project Metrics
TDLR #EABPRJB5812047Project Closed
Project has been completed and closed
๐Scope of Work
1,439 sf addition to existing library. restroom remodelinto ADA accessible restrooms. ADA accessible ramp in ca
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.7M total๐Related City Permits
Building permits found at or near this location
Partial repipe of the drain system. This is tunnel job
Express: Bathroom remodel for master and hall bath: drain replacement for tub to shower conversion install new supply line replace 100 sf of sheetrock install new shower pans replace valves tub/shower faucet relocate plumbing lines from left side to right side of shower area replace vanity light
Trench to repair sewer yard line.
Replacement of complete existing central heat and air system with or without duct work
Replace drain lines to SF res home via tunneling and replace sewer yard line.