URBAN EVE
URBAN EVE is a renovation/alteration project at 2705 E BROADWAY, SUITE 131, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2015). The project has an estimated value of $180K.
๐Project Metrics
TDLR #EABPRJB5812598Project Closed
Project has been completed and closed
URBAN EVE is a Renovation/Alteration project located at 2705 E BROADWAY, SUITE 131, Pearland, TX 77581 in Pearland, Texas. The project has an estimated value of $180K. ALLON PROPERTY MANAGEMENT is the property owner and THREE SQUARE DESIGN GROUP is the design firm of record. The project was registered with TDLR on March 26, 2015.
โFrequently Asked Questions
What is URBAN EVE?
URBAN EVE is a renovation/alteration project at 2705 E BROADWAY, SUITE 131 in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TENANT REMODEL IN AN EXISTING SHELL BUILDING
Is URBAN EVE open in Pearland?
Construction on URBAN EVE is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2015. The building is finished and very likely open.
Where is URBAN EVE located?
URBAN EVE is located at 2705 E BROADWAY, SUITE 131, Pearland, TX, 77581, in Brazoria County.
Who is the owner or developer of URBAN EVE?
ALLON PROPERTY MANAGEMENT is the property owner/developer of record for URBAN EVE, per its TDLR project registration.
Who is the architect or design firm for URBAN EVE?
THREE SQUARE DESIGN GROUP is the design firm of record for URBAN EVE, according to its TDLR filing.
How much does URBAN EVE cost and how big is it?
URBAN EVE has an estimated construction value of $180K, based on its TDLR filing.
๐Scope of Work
TENANT REMODEL IN AN EXISTING SHELL BUILDING
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 26, 2015
Review Complete
Inspection Complete
Closed
Jul 1, 2015