DOLLAR TREE
DOLLAR TREE is a renovation/alteration project at 1639 S. BUCKNER BLVD Suite 150, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2016). The project has an estimated value of $152K.
๐Project Metrics
TDLR #EABPRJB5814640Project Closed
Project has been completed and closed
DOLLAR TREE is a Renovation/Alteration project located at 1639 S. BUCKNER BLVD Suite 150, Dallas, TX 75217 in Dallas, Texas. The project has an estimated value of $152K. 1639 BUCKNER PLAZA LLC is the property owner and SGA DESIGN GROUP P.C. is the design firm of record. The project was registered with TDLR on April 27, 2015.
โFrequently Asked Questions
What is DOLLAR TREE?
DOLLAR TREE is a renovation/alteration project at 1639 S. BUCKNER BLVD Suite 150 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of existing retail construction
Is DOLLAR TREE open in Dallas?
Construction on DOLLAR TREE is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2016. The building is finished and very likely open.
Where is DOLLAR TREE located?
DOLLAR TREE is located at 1639 S. BUCKNER BLVD Suite 150, Dallas, TX, 75217, in Dallas County.
Who is the owner or developer of DOLLAR TREE?
1639 BUCKNER PLAZA LLC is the property owner/developer of record for DOLLAR TREE, per its TDLR project registration.
Who is the architect or design firm for DOLLAR TREE?
SGA DESIGN GROUP P.C. is the design firm of record for DOLLAR TREE, according to its TDLR filing.
How much does DOLLAR TREE cost and how big is it?
DOLLAR TREE has an estimated construction value of $152K, based on its TDLR filing.
๐Scope of Work
Interior finish out of existing retail construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2015
Review Complete
Inspection Complete
Closed
Jan 1, 2016