SPEC SUITE 385
SPEC SUITE 385 is a additions to existing building project at 5000 QUORUM DRIVE Suite 385, Addison, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2015). The project has an estimated value of $69K.
๐Project Metrics
TDLR #EABPRJB5815041Project Closed
Project has been completed and closed
SPEC SUITE 385 is a Additions to Existing Building project located at 5000 QUORUM DRIVE Suite 385, Addison, TX 75254 in Addison, Texas. The project has an estimated value of $69K. G&I VIII QUORUM PLACE LP is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on May 1, 2015.
โFrequently Asked Questions
What is SPEC SUITE 385?
SPEC SUITE 385 is a additions to existing building project at 5000 QUORUM DRIVE Suite 385 in Addison, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Building Improvements to Suite
Is SPEC SUITE 385 open in Addison?
Construction on SPEC SUITE 385 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2015. The building is finished and very likely open.
Where is SPEC SUITE 385 located?
SPEC SUITE 385 is located at 5000 QUORUM DRIVE Suite 385, Addison, TX, 75254, in Dallas County.
Who is the owner or developer of SPEC SUITE 385?
G&I VIII QUORUM PLACE LP is the property owner/developer of record for SPEC SUITE 385, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 385?
ENTOS DESIGN is the design firm of record for SPEC SUITE 385, according to its TDLR filing.
How much does SPEC SUITE 385 cost and how big is it?
SPEC SUITE 385 has an estimated construction value of $69K, based on its TDLR filing.
๐Scope of Work
Building Improvements to Suite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 1, 2015
Review Complete
Inspection Complete
Closed
Aug 1, 2015