MASH'D
MASH'D is a renovation/alteration project at 17623 LA CANTERA PARKWAY Suite 812, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2015). The project has an estimated value of $650K.
๐Project Metrics
TDLR #EABPRJB5816110Project Closed
Project has been completed and closed
MASH'D is a Renovation/Alteration project located at 17623 LA CANTERA PARKWAY Suite 812, San Antonio, TX 78257 in San Antonio, Texas. The project has an estimated value of $650K. PHASE V RIM LLC is the property owner and ID STUDIO 4 is the design firm of record. The project was registered with TDLR on May 18, 2015.
โFrequently Asked Questions
What is MASH'D?
MASH'D is a renovation/alteration project at 17623 LA CANTERA PARKWAY Suite 812 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish-out of a raw space to accommodate a restaurant
Is MASH'D open in San Antonio?
Construction on MASH'D is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2015. The building is finished and very likely open.
Where is MASH'D located?
MASH'D is located at 17623 LA CANTERA PARKWAY Suite 812, San Antonio, TX, 78257, in Bexar County.
Who is the owner or developer of MASH'D?
PHASE V RIM LLC is the property owner/developer of record for MASH'D, per its TDLR project registration.
Who is the architect or design firm for MASH'D?
ID STUDIO 4 is the design firm of record for MASH'D, according to its TDLR filing.
How much does MASH'D cost and how big is it?
MASH'D has an estimated construction value of $650K, based on its TDLR filing.
๐Scope of Work
Interior Finish-out of a raw space to accommodate a restaurant
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 18, 2015
Review Complete
Inspection Complete
Closed
Sep 1, 2015