MATTRESS FIRM
MATTRESS FIRM is a renovation/alteration project at 2319 IH 35, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2016). The project has an estimated value of $260K.
๐Project Metrics
TDLR #EABPRJB5818487Project Closed
Project has been completed and closed
MATTRESS FIRM is a Renovation/Alteration project located at 2319 IH 35, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $260K. PRIMUS REAL ESTATE is the property owner and IDGROUP, THE is the design firm of record. The project was registered with TDLR on June 30, 2015.
โFrequently Asked Questions
What is MATTRESS FIRM?
MATTRESS FIRM is a renovation/alteration project at 2319 IH 35 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope of this project includes structural modifications of an existing single floor building and interior fi
Is MATTRESS FIRM open in San Marcos?
Construction on MATTRESS FIRM is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2016. The building is finished and very likely open.
Where is MATTRESS FIRM located?
MATTRESS FIRM is located at 2319 IH 35, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of MATTRESS FIRM?
PRIMUS REAL ESTATE is the property owner/developer of record for MATTRESS FIRM, per its TDLR project registration.
Who is the architect or design firm for MATTRESS FIRM?
IDGROUP, THE is the design firm of record for MATTRESS FIRM, according to its TDLR filing.
How much does MATTRESS FIRM cost and how big is it?
MATTRESS FIRM has an estimated construction value of $260K, based on its TDLR filing.
๐Scope of Work
The scope of this project includes structural modifications of an existing single floor building and interior fi
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 30, 2015
Review Complete
Inspection Complete
Closed
Mar 1, 2016
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Tub to shower conversion in hall bathroom Replace walls in shower
Tub to shower conversion in hall bathroom Replace walls in shower
Replace sewer yard line from house connection to City tap.
Replacement of an existing water heater Replace 50-gallon Gas Water Heater
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton horizontal gas system (downstairs)