NORDSTROM - EBAR
NORDSTROM - EBAR is a new construction project at 11600 ALTERRA PARKWAY, BLDG C., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2016). The project has an estimated value of $400K.
๐Project Metrics
TDLR #EABPRJB5819281Project Closed
Project has been completed and closed
NORDSTROM - EBAR is a New Construction project located at 11600 ALTERRA PARKWAY, BLDG C., Austin, TX 78758 in Austin, Texas. The project has an estimated value of $400K. NORDSTROM is the property owner and ARIA GROUP ARCHITECTS INC. is the design firm of record. The project was registered with TDLR on July 3, 2015.
โFrequently Asked Questions
What is NORDSTROM - EBAR?
NORDSTROM - EBAR is a new construction project at 11600 ALTERRA PARKWAY, BLDG C. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant build out of a new eBar in the Nordstrom Domain Mall
Is NORDSTROM - EBAR open in Austin?
Construction on NORDSTROM - EBAR is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2016. The building is finished and very likely open.
Where is NORDSTROM - EBAR located?
NORDSTROM - EBAR is located at 11600 ALTERRA PARKWAY, BLDG C., Austin, TX, 78758, in Travis County.
Who is the owner or developer of NORDSTROM - EBAR?
NORDSTROM is the property owner/developer of record for NORDSTROM - EBAR, per its TDLR project registration.
Who is the architect or design firm for NORDSTROM - EBAR?
ARIA GROUP ARCHITECTS INC. is the design firm of record for NORDSTROM - EBAR, according to its TDLR filing.
How much does NORDSTROM - EBAR cost and how big is it?
NORDSTROM - EBAR has an estimated construction value of $400K, based on its TDLR filing.
๐Scope of Work
Tenant build out of a new eBar in the Nordstrom Domain Mall
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 3, 2015
Review Complete
Inspection Complete
Closed
Sep 1, 2016
๐Related Projects
๐คSame Owner
$18.7M total๐Related City Permits
Building permits found at or near this location
Run 60 amp circuit from outdoor main electrical panel back to back into garage and mount customer supplied Tesla wall connector. Total NEC calculated load 148 A. Current service size 200 amp.
Suite #140 need to replace existing 1/2-inch backflow preventer serving the ice machine with a new code-compliant 1/2-inch backflow prevention assembly. Work includes disconnecting and removing the existing device installing the replacement testing for proper operation and restoring service to the ice machine.
7 DAY - Fire rebuild on levels 2-4 at existing MF apartments -OVA
7 DAY - Fire rebuild on levels 2-4 at existing MF apartments -OVA
REPLACE THE SERVICE FOR OFFICE COMPLEX INCLUDES 4 OCCUPIED OFFICES- THE SERVICE CAUGHT FIRE AND NEEDS NEW GUTTER TAP BOX DISCONNECTS AND METERS; NO ESPA NEEDED- PEC ELECTRIC SVC PROVIDER
Property Owner
Design Firm
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis