CVS PHARMACY #7422 ADA
CVS PHARMACY #7422 ADA is a renovation/alteration project at 920 TX 80, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2015). The project has an estimated value of $60K.
๐Project Metrics
TDLR #EABPRJB5819374Project Closed
Project has been completed and closed
CVS PHARMACY #7422 ADA is a Renovation/Alteration project located at 920 TX 80, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $60K. NORR LLC is the property owner and NORR LLC is the design firm of record. The project was registered with TDLR on July 6, 2015.
โFrequently Asked Questions
What is CVS PHARMACY #7422 ADA?
CVS PHARMACY #7422 ADA is a renovation/alteration project at 920 TX 80 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Alterations to exterior parking, accessible path to ROWto meet TAS.
Is CVS PHARMACY #7422 ADA open in San Marcos?
Construction on CVS PHARMACY #7422 ADA is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2015. The building is finished and very likely open.
Where is CVS PHARMACY #7422 ADA located?
CVS PHARMACY #7422 ADA is located at 920 TX 80, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of CVS PHARMACY #7422 ADA?
NORR LLC is the property owner/developer of record for CVS PHARMACY #7422 ADA, per its TDLR project registration.
Who is the architect or design firm for CVS PHARMACY #7422 ADA?
NORR LLC is the design firm of record for CVS PHARMACY #7422 ADA, according to its TDLR filing.
How much does CVS PHARMACY #7422 ADA cost and how big is it?
CVS PHARMACY #7422 ADA has an estimated construction value of $60K, based on its TDLR filing.
๐Scope of Work
Alterations to exterior parking, accessible path to ROWto meet TAS.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 6, 2015
Review Complete
Inspection Complete
Closed
Nov 1, 2015
๐Related Projects
๐คSame Owner
$159.2M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Vertical Gas
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton gas horizontal
**TPOLE REF BP # 2026-069969**
100 tunnel below the foundation to replace entire drain system. 3 access holes. 3 access holes - left right back
*Partial Demo* Addition/handrail remodel of attached covered/uncovered two-level deck