Construction complete ยท Aug 2016๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL

8004 CAMERON ROAD, Austin, TX 78754, Austin, TX, 78754

KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL is a renovation/alteration project at 8004 CAMERON ROAD, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2016). The project has an estimated value of $5.2M.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB5820715
$5.2M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
7 months
Duration
Registered:Jul 27, 2015
Start:Jan 1, 2016
Target:Aug 1, 2016
๐Ÿ

Project Closed

Project has been completed and closed

KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL is a Renovation/Alteration project located at 8004 CAMERON ROAD, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $5.2M. KIPP AUSTIN PUBLIC SCHOOLS is the property owner and STG DESIGN is the design firm of record. The project was registered with TDLR on July 27, 2015.

โ“Frequently Asked Questions

What is KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL?

KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL is a renovation/alteration project at 8004 CAMERON ROAD in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation to existing concrete tiltwall building to house 57,000 sqft high school.

Is KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL open in Austin?

Construction on KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL is complete โ€” TDLR records show the project passed its required accessibility inspection in Aug 2016. The building is finished and very likely open.

Where is KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL located?

KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL is located at 8004 CAMERON ROAD, Austin, TX, 78754, in Travis County.

Who is the owner or developer of KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL?

KIPP AUSTIN PUBLIC SCHOOLS is the property owner/developer of record for KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL, per its TDLR project registration.

Who is the architect or design firm for KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL?

STG DESIGN is the design firm of record for KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL, according to its TDLR filing.

How much does KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL cost and how big is it?

KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL has an estimated construction value of $5.2M, based on its TDLR filing.

๐Ÿ“‹Scope of Work

Renovation to existing concrete tiltwall building to house 57,000 sqft high school.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 27, 2015
Project Closed
August 1, 2016
Construction Start
January 1, 2016
Expected Completion
August 1, 2016

๐Ÿ“…Project Timeline

Filed

Jul 27, 2015

Review Complete

Inspection Complete

Closed

Aug 1, 2016

๐Ÿ“„Related City Permits

Building permits found at or near this location

8004 ALOPHIA DR

Replacement of an existing water heater Replace Navien 240a2 Gas Tankless Water Heater Location: 2nd floor attic

FinalPlumbing PermitChange OutJun 2026
View Details
2026-080060 PP
๐Ÿ”งAmerican Residential Services (ARS) - Rescue Rooter
8004 CAMDEN DR

Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.

ActiveMechanical PermitChange OutJun 2026
View Details
2026-079236 MP
๐Ÿ”งRadiant Plumbing and Air Conditioning
8004 CAMDEN DR

Replacement of an existing water heater water heater change out 8004 Camden Drive Austin TX 78757

ActivePlumbing PermitChange OutJun 2026
View Details
2026-076125 PP
๐Ÿ”งRadiant Plumbing & AC
8004 BIRD SONG CIR

New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (Unit A) Revision 1: a 611 inspection was triggered and now it needs to be removed from multiple addresses. We need to to switch a water tap inspection from yes to not required

ActiveBuilding PermitNewMay 2026
View Details
2026-059697 BP
๐Ÿ”งNew Home Co
8004 PONCHO PASS

Irrigation Installation

FinalPlumbing PermitIrrigationFeb 2026
View Details
2026-023119 PP

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists