KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL
๐Project Metrics
TDLR #EABPRJB5820715Project Closed
Project has been completed and closed
๐Scope of Work
Renovation to existing concrete tiltwall building to house 57,000 sqft high school.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$9.9M total๐Related City Permits
Building permits found at or near this location
Irrigation Installation
Irrigation Installation
Element: Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <35 feet New 3/4ยฟ EMT conduit to power the Level 2 EV Charger at 48amp constant draw.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 4 Bedrooms 3.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8002 PONCHO PASS 2025-070719 PR (INCLUDES 23 ADDRESSES.)
Install EV Circuit