DR. TONY JACOBS, OD
DR. TONY JACOBS, OD is a renovation/alteration project at 1205 HIGHWAY 290, Elgin, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2015). The project has an estimated value of $215K.
๐Project Metrics
TDLR #EABPRJB5820910Project Closed
Project has been completed and closed
DR. TONY JACOBS, OD is a Renovation/Alteration project located at 1205 HIGHWAY 290, Elgin, TX 78261 in Elgin, Texas. The project has an estimated value of $215K. DR. TONY JACOBS OD is the property owner and BRYAN HORN is the design firm of record. The project was registered with TDLR on July 29, 2015.
โFrequently Asked Questions
What is DR. TONY JACOBS, OD?
DR. TONY JACOBS, OD is a renovation/alteration project at 1205 HIGHWAY 290 in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2,691 square foot interior tenant improvement of an optometrist office.
Is DR. TONY JACOBS, OD open in Elgin?
Construction on DR. TONY JACOBS, OD is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2015. The building is finished and very likely open.
Where is DR. TONY JACOBS, OD located?
DR. TONY JACOBS, OD is located at 1205 HIGHWAY 290, Elgin, TX, 78261, in Bastrop County.
Who is the owner or developer of DR. TONY JACOBS, OD?
DR. TONY JACOBS OD is the property owner/developer of record for DR. TONY JACOBS, OD, per its TDLR project registration.
Who is the architect or design firm for DR. TONY JACOBS, OD?
BRYAN HORN is the design firm of record for DR. TONY JACOBS, OD, according to its TDLR filing.
How much does DR. TONY JACOBS, OD cost and how big is it?
DR. TONY JACOBS, OD has an estimated construction value of $215K, based on its TDLR filing.
๐Scope of Work
2,691 square foot interior tenant improvement of an optometrist office.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 29, 2015
Review Complete
Inspection Complete
Closed
Nov 1, 2015
๐Related Projects
๐๏ธSame Design Firm
$465K total๐Related City Permits
Building permits found at or near this location
Tesla proposing to add EV charging to existing parking. Includes the installation of 3 PSU which include 3 cabinets 24 charging posts 6 luminaires 1 Tesla site controller 1 switchboard assembly 1 utility transformer 1 meter 1 primary metering cabinet
Electrical Underground Primary and Secondary Service to Building. Installing 1 House Panel Tap Can and wire way in ETJ
Tesla proposing to add EV charging to existing parking. Includes the installation of 3 PSU which include 3 cabinets 24 charging posts 6 luminaires 1 Tesla site controller 1 switchboard assembly 1 utility transformer 1 meter 1 primary metering cabinet
New prefabricated inground swimming pool w/ reqd enclosure device for existing 1-story single family residence.
Replacement of complete existing central heat and air system with or without duct work REPLACE EXISTING HVAC SYSTEM