Construction complete ยท Nov 2016๐ŸProject Closed๐Ÿ”ง Additions to Existing Building๐Ÿ’ต This project is privately funded, on private land for private use.

PUMP ROOM ADDITION TO EL MILAGRO

400 BARNES DRIVE, San Marcos, TX 78666, San Marcos, TX, 78666

PUMP ROOM ADDITION TO EL MILAGRO is a additions to existing building project at 400 BARNES DRIVE, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2016). The project has an estimated value of $65K.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB5821385
$65K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
1 year
Duration
Registered:Aug 5, 2015
Start:Nov 1, 2015
Target:Nov 1, 2016
๐Ÿ

Project Closed

Project has been completed and closed

PUMP ROOM ADDITION TO EL MILAGRO is a Additions to Existing Building project located at 400 BARNES DRIVE, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $65K. 400 BD LLC is the property owner and GKZ INC. is the design firm of record. The project was registered with TDLR on August 5, 2015.

โ“Frequently Asked Questions

What is PUMP ROOM ADDITION TO EL MILAGRO?

PUMP ROOM ADDITION TO EL MILAGRO is a additions to existing building project at 400 BARNES DRIVE in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of one-story pump equipment room to an existingtortilla factory.

Is PUMP ROOM ADDITION TO EL MILAGRO open in San Marcos?

Construction on PUMP ROOM ADDITION TO EL MILAGRO is complete โ€” TDLR records show the project passed its required accessibility inspection in Nov 2016. The building is finished and very likely open.

Where is PUMP ROOM ADDITION TO EL MILAGRO located?

PUMP ROOM ADDITION TO EL MILAGRO is located at 400 BARNES DRIVE, San Marcos, TX, 78666, in Hays County.

Who is the owner or developer of PUMP ROOM ADDITION TO EL MILAGRO?

400 BD LLC is the property owner/developer of record for PUMP ROOM ADDITION TO EL MILAGRO, per its TDLR project registration.

Who is the architect or design firm for PUMP ROOM ADDITION TO EL MILAGRO?

GKZ INC. is the design firm of record for PUMP ROOM ADDITION TO EL MILAGRO, according to its TDLR filing.

How much does PUMP ROOM ADDITION TO EL MILAGRO cost and how big is it?

PUMP ROOM ADDITION TO EL MILAGRO has an estimated construction value of $65K, based on its TDLR filing.

๐Ÿ“‹Scope of Work

Addition of one-story pump equipment room to an existingtortilla factory.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
August 5, 2015
Project Closed
November 1, 2016
Construction Start
November 1, 2015
Expected Completion
November 1, 2016

๐Ÿ“…Project Timeline

Filed

Aug 5, 2015

Review Complete

Inspection Complete

Closed

Nov 1, 2016

๐Ÿ“„Related City Permits

Building permits found at or near this location

4001 ADELPHI LN

Installation of a 240 sf (8 ft x 30 ft) pre-fabricated aluminum covered walkway at the Eastside campus entrance to provide weather protection from the drop-off point to the building. Scope includes laying out and placing 6 concrete footings to support structural columns. All work to be completed per engineering specifications.

ActiveBuilding PermitNewJul 2026
$47K
View Details
2026-086295 BP
๐Ÿ”งAustin International School
4006 TRAVIS COUNTRY CIR

Gas line to New Generator

ActivePlumbing PermitRepairJul 2026
View Details
2026-087002 PP
๐Ÿ”งABC Home & Commercial Service
400 GROVE BLVD

Installation of solar light poles around the existing playground area to increase security. 2026 015673 DA - Approved

ActiveBuilding PermitRemodelJul 2026
View Details
2026-086409 BP
๐Ÿ”งCity of Austin Parks and Recreation Department
400 W CESAR CHAVEZ ST

Extend existing circuits from existing starline busway to 8) rows of benches in 5th floor lab. This scope of work was discussed and approved by Hyatt Dunn.

ActiveElectrical PermitUpgradeJul 2026
View Details
2026-086439 EP
๐Ÿ”งJMEG, LP
4001 HARBORLIGHT CV

Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton horizontal gas system

ActiveMechanical PermitChange OutJul 2026
View Details
2026-085677 MP
๐Ÿ”งStan's Heating, Air, Plumbing, & Electrical

Get alerts for Hays

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists