SPEC SUITE 209
SPEC SUITE 209 is a renovation/alteration project at 1600 COIT ROAD, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2015). The project has an estimated value of $70K.
๐Project Metrics
TDLR #EABPRJB6801471Project Closed
Project has been completed and closed
SPEC SUITE 209 is a Renovation/Alteration project located at 1600 COIT ROAD, Plano, TX 75039 in Plano, Texas. The project has an estimated value of $70K. MEDICAL OFFICE BUILDINGS OF PLANO LP is the property owner and LINCOLN HARRIS CSG is the design firm of record. The project was registered with TDLR on September 24, 2015.
โFrequently Asked Questions
What is SPEC SUITE 209?
SPEC SUITE 209 is a renovation/alteration project at 1600 COIT ROAD in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Alterations to an existing suite in an existing office building.
Is SPEC SUITE 209 open in Plano?
Construction on SPEC SUITE 209 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2015. The building is finished and very likely open.
Where is SPEC SUITE 209 located?
SPEC SUITE 209 is located at 1600 COIT ROAD, Plano, TX, 75039, in Collin County.
Who is the owner or developer of SPEC SUITE 209?
MEDICAL OFFICE BUILDINGS OF PLANO LP is the property owner/developer of record for SPEC SUITE 209, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 209?
LINCOLN HARRIS CSG is the design firm of record for SPEC SUITE 209, according to its TDLR filing.
How much does SPEC SUITE 209 cost and how big is it?
SPEC SUITE 209 has an estimated construction value of $70K, based on its TDLR filing.
๐Scope of Work
Alterations to an existing suite in an existing office building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 24, 2015
Review Complete
Inspection Complete
Closed
Dec 1, 2015