IH 30
IH 30 is a new construction project at IH 30 @ SH 360 INTERCHANGE, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $228.6M across about 1,000 sq ft.
๐Project Metrics
TDLR #EABPRJB6802954Review Complete
Design review complete, construction may proceed
IH 30 is a New Construction project located at IH 30 @ SH 360 INTERCHANGE, Arlington, TX 76011 in Arlington, Texas. The project has an estimated value of $228.6M covering 1,000 sq ft. TXDOT DISTRICT: FORT WORTH is the property owner and TXDOT is the design firm of record. The project was registered with TDLR on October 16, 2015.
โFrequently Asked Questions
What is IH 30?
IH 30 is a new construction project at IH 30 @ SH 360 INTERCHANGE in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct direct connector interchange at SH 360 and traffic management systme.
Is IH 30 open in Arlington?
IH 30 is currently under construction in Arlington, TX. Its current TDLR status is "Review Complete".
Where is IH 30 located?
IH 30 is located at IH 30 @ SH 360 INTERCHANGE, Arlington, TX, 76011, in Tarrant County.
Who is the owner or developer of IH 30?
TXDOT DISTRICT: FORT WORTH is the property owner/developer of record for IH 30, per its TDLR project registration.
Who is the architect or design firm for IH 30?
TXDOT is the design firm of record for IH 30, according to its TDLR filing.
How much does IH 30 cost and how big is it?
IH 30 has an estimated construction value of $228.6M and approximately 1,000 square feet (about $228.62K/sqft), based on its TDLR filing.
๐Scope of Work
Construct direct connector interchange at SH 360 and traffic management systme.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 16, 2015
Review Complete
Oct 16, 2015
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$37.03B total๐๏ธSame Design Firm
$37.03B totalProperty Owner
Design Firm
Tarrant County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Tarrant County
Find General Contractors in Tarrant