RM 2244
RM 2244 is a new construction project at 0.1 MI E OF REDBUD TRAIL TO Walsh Tarlton, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2018). The project has an estimated value of $567K.
๐Project Metrics
TDLR #EABPRJB6804755Inspection Complete
Final inspection completed, awaiting project closure
RM 2244 is a New Construction project located at 0.1 MI E OF REDBUD TRAIL TO Walsh Tarlton, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $567K. TXDOT DISTRICT: AUSTIN is the property owner and CH2M HILL is the design firm of record. The project was registered with TDLR on November 13, 2015.
โFrequently Asked Questions
What is RM 2244?
RM 2244 is a new construction project at 0.1 MI E OF REDBUD TRAIL TO Walsh Tarlton in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct 4-lane urban roadway with continuous left turnlane
Is RM 2244 open in Austin?
Construction on RM 2244 is complete โ TDLR records show the project passed its required accessibility inspection in May 2018. The building is finished and very likely open.
Where is RM 2244 located?
RM 2244 is located at 0.1 MI E OF REDBUD TRAIL TO Walsh Tarlton, Austin, TX, 78746, in Travis County.
Who is the owner or developer of RM 2244?
TXDOT DISTRICT: AUSTIN is the property owner/developer of record for RM 2244, per its TDLR project registration.
Who is the architect or design firm for RM 2244?
CH2M HILL is the design firm of record for RM 2244, according to its TDLR filing.
How much does RM 2244 cost and how big is it?
RM 2244 has an estimated construction value of $567K, based on its TDLR filing.
๐Scope of Work
Construct 4-lane urban roadway with continuous left turnlane
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 13, 2015
Review Complete
Inspection Complete
May 1, 2018
Closed
๐Related Projects
๐คSame Owner
$37.03B total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
**Partial demo** Addition remodel: 2-story addition. Detached guest house to be attached to existing SFR.
Replacement of complete existing central heat and air system with or without duct work
Repipe all domestic water piping within the home to eliminate the existing copper piping within the slab excluding where main service enters the home.Includes all hot and cold water piping up to the emergency shut off valves/tub and shower valves. All piping to be properly secured and insulated. Piping will run overhead in attic and drop down inside the walls at each fixture.
Repair and replace drains below the foundation
Express: Foundation Repair
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis