LEHMAN HIGH SCHOOL CTE is a additions to existing building project at 1700 LEHMAN, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $1.0M.
Project has been completed and closed
LEHMAN HIGH SCHOOL CTE is a Additions to Existing Building project located at 1700 LEHMAN, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $1.0M. HAYS CISD is the property owner and CLAYCOMB ASSOCIATES ARCHITECTS is the design firm of record. The project was registered with TDLR on November 13, 2015.
LEHMAN HIGH SCHOOL CTE is a additions to existing building project at 1700 LEHMAN in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: One story masonry and metal roof shop addition to existing school; locker room renovations.
Construction on LEHMAN HIGH SCHOOL CTE is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.
LEHMAN HIGH SCHOOL CTE is located at 1700 LEHMAN, Kyle, TX, 78640, in Hays County.
HAYS CISD is the property owner/developer of record for LEHMAN HIGH SCHOOL CTE, per its TDLR project registration.
CLAYCOMB ASSOCIATES ARCHITECTS is the design firm of record for LEHMAN HIGH SCHOOL CTE, according to its TDLR filing.
LEHMAN HIGH SCHOOL CTE has an estimated construction value of $1.0M, based on its TDLR filing.
One story masonry and metal roof shop addition to existing school; locker room renovations.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 13, 2015
Review Complete
Inspection Complete
Closed
Jul 1, 2016
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Install front-lit channel letters on raceway H&R BLOCK on south elevation