RODEO WINE BAR
RODEO WINE BAR is a renovation/alteration project at TERMINAL- B/BS-2-07A-A01, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2016). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB6806295Project Closed
Project has been completed and closed
RODEO WINE BAR is a Renovation/Alteration project located at TERMINAL- B/BS-2-07A-A01, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $80K. DFW AIRPORT is the property owner and WILLIAM PECK & ASSOC. INC. is the design firm of record. The project was registered with TDLR on December 10, 2015.
โFrequently Asked Questions
What is RODEO WINE BAR?
RODEO WINE BAR is a renovation/alteration project at TERMINAL- B/BS-2-07A-A01 in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: remodel of an existing bar in the airport
Is RODEO WINE BAR open in Dfw Airport?
Construction on RODEO WINE BAR is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2016. The building is finished and very likely open.
Where is RODEO WINE BAR located?
RODEO WINE BAR is located at TERMINAL- B/BS-2-07A-A01, Dfw Airport, TX, 75261, in Tarrant County.
Who is the owner or developer of RODEO WINE BAR?
DFW AIRPORT is the property owner/developer of record for RODEO WINE BAR, per its TDLR project registration.
Who is the architect or design firm for RODEO WINE BAR?
WILLIAM PECK & ASSOC. INC. is the design firm of record for RODEO WINE BAR, according to its TDLR filing.
How much does RODEO WINE BAR cost and how big is it?
RODEO WINE BAR has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
remodel of an existing bar in the airport
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 10, 2015
Review Complete
Inspection Complete
Closed
Mar 1, 2016