Construction complete ยท May 2017๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

FORECPOINT- DATA CENTER

10900 STONELAKE BLVD. Suite 130, Austin, TX 78759, Austin, TX, 78759

FORECPOINT- DATA CENTER is a renovation/alteration project at 10900 STONELAKE BLVD. Suite 130, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2017). The project has an estimated value of $2.1M.

Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB6809164
$2.1M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
1y 2mo
Duration
Registered:Feb 1, 2016
Start:Mar 1, 2016
Target:May 1, 2017
๐Ÿ

Project Closed

Project has been completed and closed

FORECPOINT- DATA CENTER is a Renovation/Alteration project located at 10900 STONELAKE BLVD. Suite 130, Austin, TX 78759 in Austin, Texas. The project has an estimated value of $2.1M. LINCOLN PROPERTY COMPANY is the property owner and STG DESIGN is the design firm of record. The project was registered with TDLR on February 1, 2016.

โ“Frequently Asked Questions

What is FORECPOINT- DATA CENTER?

FORECPOINT- DATA CENTER is a renovation/alteration project at 10900 STONELAKE BLVD. Suite 130 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project includes the renovation of a space for a data center.

Is FORECPOINT- DATA CENTER open in Austin?

Construction on FORECPOINT- DATA CENTER is complete โ€” TDLR records show the project passed its required accessibility inspection in May 2017. The building is finished and very likely open.

Where is FORECPOINT- DATA CENTER located?

FORECPOINT- DATA CENTER is located at 10900 STONELAKE BLVD. Suite 130, Austin, TX, 78759, in Travis County.

Who is the owner or developer of FORECPOINT- DATA CENTER?

LINCOLN PROPERTY COMPANY is the property owner/developer of record for FORECPOINT- DATA CENTER, per its TDLR project registration.

Who is the architect or design firm for FORECPOINT- DATA CENTER?

STG DESIGN is the design firm of record for FORECPOINT- DATA CENTER, according to its TDLR filing.

How much does FORECPOINT- DATA CENTER cost and how big is it?

FORECPOINT- DATA CENTER has an estimated construction value of $2.1M, based on its TDLR filing.

๐Ÿ“‹Scope of Work

This project includes the renovation of a space for a data center.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
February 1, 2016
Project Closed
May 1, 2017
Construction Start
March 1, 2016
Expected Completion
May 1, 2017

๐Ÿ“…Project Timeline

Filed

Feb 1, 2016

Review Complete

Inspection Complete

Closed

May 1, 2017

๐Ÿ“Location & Views

Open in MapsGet Directions|30.39972, -97.73441

๐Ÿ“„Related City Permits

Building permits found at or near this location

10900 STONELAKE BLVD BLDG 2 UNIT 100
0.20 mi away

Interior remodel to existing office PR 2025 123948 / BP 2025 133362 will be withdrawn once this BP is issued as the PR above is a QT and cant be revised but it has existing inspections that need to be transferred over.

FinalMechanical PermitRemodelMar 2026
View Details
2026-023922 MP
๐Ÿ”งTeam Services
10900 SHORT SPRINGS DR--FDN
5.84 mi away

Express: Foundation repair

FinalBuilding PermitRepairApr 2026
$1
View Details
2026-048197 BP
๐Ÿ”งGL Hunt Foundation Repair
10900 CASITAS DR
7.40 mi away

Replacement of complete existing central heat and air system with or without duct work hvac change out

FinalMechanical PermitChange OutMar 2026
View Details
2026-037180 MP
๐Ÿ”งNew Abacus
10900 BEACHAM CT
17.28 mi away

INTERIOR FULL FINISH OUT. EXISTING DRYWALL IS GUTTED AND CEILINGS EXPOSED. INTERIOR/EXTERIOR DOOR REPLACEMENT CABINETS DRYEWALL NEW ENGINEERED STAIRWELL RELOCATE WINDOW REPLACEMENT SHOWER RECONFIGURATION POWDER BATH AND UTILITY ROOM RECONFIGURATION. LIGHTING REPLACEMENT ONLY.

ActiveElectrical PermitAddition and RemodelJun 2026
View Details
2025-087726 EP
๐Ÿ”งHart Electrical Services
10900 FULTON AVE

Install Tesla EV Charger

ActiveElectrical PermitRepairJun 2026
View Details
2026-072208 EP
๐Ÿ”งMorning Star Light & Electric

๐Ÿ“Related Site Plans

City of Austin site plan approvals at this location

Quick Actions

TDLR ID: EABPRJB6809164

Design Firm

๐Ÿ›๏ธ
STG DESIGN
856 projects ยท $4.94B
View company profile
JIM SUSMAN 828 WEST 6TH STREET SUITE 300, AUSTIN, TX 78703

Location Intelligence

Active businesses near this construction site

Quarry848 ft (259m) elevation

Roaring Fork

0.2 mi
Restaurant
4.5(3,746)
Upgrade to viewroaringfork.com

Holiday Inn Express & Suites Austin NW - Arboretum Area by IHG

0.3 mi
Gym
4.5(835)
Upgrade to viewihg.com/holidayinnex

Larry C. Kravitz, MD

450 ft
Doctor
4.9(189)
Upgrade to viewaustinregionalclinic

Business data from Google

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists