22ND FLOOR WHITE BOX
22ND FLOOR WHITE BOX is a renovation/alteration project at 13155 NOEL ROAD, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2016). The project has an estimated value of $224K.
๐Project Metrics
TDLR #EABPRJB6811188Project Closed
Project has been completed and closed
22ND FLOOR WHITE BOX is a Renovation/Alteration project located at 13155 NOEL ROAD, Dallas, TX 75240 in Dallas, Texas. The project has an estimated value of $224K. SPUS7 GALLERIA LP is the property owner and GO STUDIO is the design firm of record. The project was registered with TDLR on March 2, 2016.
โFrequently Asked Questions
What is 22ND FLOOR WHITE BOX?
22ND FLOOR WHITE BOX is a renovation/alteration project at 13155 NOEL ROAD in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in high rise building.
Is 22ND FLOOR WHITE BOX open in Dallas?
Construction on 22ND FLOOR WHITE BOX is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2016. The building is finished and very likely open.
Where is 22ND FLOOR WHITE BOX located?
22ND FLOOR WHITE BOX is located at 13155 NOEL ROAD, Dallas, TX, 75240, in Dallas County.
Who is the owner or developer of 22ND FLOOR WHITE BOX?
SPUS7 GALLERIA LP is the property owner/developer of record for 22ND FLOOR WHITE BOX, per its TDLR project registration.
Who is the architect or design firm for 22ND FLOOR WHITE BOX?
GO STUDIO is the design firm of record for 22ND FLOOR WHITE BOX, according to its TDLR filing.
How much does 22ND FLOOR WHITE BOX cost and how big is it?
22ND FLOOR WHITE BOX has an estimated construction value of $224K, based on its TDLR filing.
๐Scope of Work
Interior renovation of existing office space in high rise building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 2, 2016
Review Complete
Inspection Complete
Closed
Apr 1, 2016