TPN
TPN is a renovation/alteration project at 1999 BRYAN STREET 30TH FLOOR SUITE 3000, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2016). The project has an estimated value of $50K.
๐Project Metrics
TDLR #EABPRJB6811371Project Closed
Project has been completed and closed
TPN is a Renovation/Alteration project located at 1999 BRYAN STREET 30TH FLOOR SUITE 3000, Dallas, TX 75201 in Dallas, Texas. The project has an estimated value of $50K. FORTIS PROPERTY GROUP is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on March 3, 2016.
โFrequently Asked Questions
What is TPN?
TPN is a renovation/alteration project at 1999 BRYAN STREET 30TH FLOOR SUITE 3000 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing office space, creating a new print production room and proofing room.
Is TPN open in Dallas?
Construction on TPN is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2016. The building is finished and very likely open.
Where is TPN located?
TPN is located at 1999 BRYAN STREET 30TH FLOOR SUITE 3000, Dallas, TX, 75201, in Dallas County.
Who is the owner or developer of TPN?
FORTIS PROPERTY GROUP is the property owner/developer of record for TPN, per its TDLR project registration.
Who is the architect or design firm for TPN?
GENSLER is the design firm of record for TPN, according to its TDLR filing.
How much does TPN cost and how big is it?
TPN has an estimated construction value of $50K, based on its TDLR filing.
๐Scope of Work
Renovation of existing office space, creating a new print production room and proofing room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 3, 2016
Review Complete
Inspection Complete
Closed
Apr 1, 2016