GREAT CLIPS
GREAT CLIPS is a new construction project at 1342 WEST 290 Suite 220, Elgin, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $85K.
๐Project Metrics
TDLR #EABPRJB6814345Project Closed
Project has been completed and closed
GREAT CLIPS is a New Construction project located at 1342 WEST 290 Suite 220, Elgin, TX 78621 in Elgin, Texas. The project has an estimated value of $85K. LINCOLN PROPERTY COMPANY is the property owner and BLUE & ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on April 14, 2016.
โFrequently Asked Questions
What is GREAT CLIPS?
GREAT CLIPS is a new construction project at 1342 WEST 290 Suite 220 in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out for a hair salon
Is GREAT CLIPS open in Elgin?
Construction on GREAT CLIPS is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.
Where is GREAT CLIPS located?
GREAT CLIPS is located at 1342 WEST 290 Suite 220, Elgin, TX, 78621, in Bastrop County.
Who is the owner or developer of GREAT CLIPS?
LINCOLN PROPERTY COMPANY is the property owner/developer of record for GREAT CLIPS, per its TDLR project registration.
Who is the architect or design firm for GREAT CLIPS?
BLUE & ASSOCIATES INC. is the design firm of record for GREAT CLIPS, according to its TDLR filing.
How much does GREAT CLIPS cost and how big is it?
GREAT CLIPS has an estimated construction value of $85K, based on its TDLR filing.
๐Scope of Work
Interior finish out for a hair salon
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 14, 2016
Review Complete
Inspection Complete
Closed
Jul 1, 2016
๐Related Projects
๐คSame Owner
$1.28B total๐๏ธSame Design Firm
$15.5M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Construct new driveway approach of 16.9 FT
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
tunnel to repair building drain system
Property Owner
Design Firm
Bastrop County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bastrop County
Find General Contractors in Bastrop