SPEC SUITE 415
SPEC SUITE 415 is a renovation/alteration project at 13455 NOEL RD. Floor 04, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2016). The project has an estimated value of $156K.
๐Project Metrics
TDLR #EABPRJB6814584Project Closed
Project has been completed and closed
SPEC SUITE 415 is a Renovation/Alteration project located at 13455 NOEL RD. Floor 04, Dallas, TX 75240 in Dallas, Texas. The project has an estimated value of $156K. SPUS7 GALLERIA LP is the property owner and GO STUDIO is the design firm of record. The project was registered with TDLR on April 19, 2016.
โFrequently Asked Questions
What is SPEC SUITE 415?
SPEC SUITE 415 is a renovation/alteration project at 13455 NOEL RD. Floor 04 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation of existing office space in high rise building.
Is SPEC SUITE 415 open in Dallas?
Construction on SPEC SUITE 415 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2016. The building is finished and very likely open.
Where is SPEC SUITE 415 located?
SPEC SUITE 415 is located at 13455 NOEL RD. Floor 04, Dallas, TX, 75240, in Dallas County.
Who is the owner or developer of SPEC SUITE 415?
SPUS7 GALLERIA LP is the property owner/developer of record for SPEC SUITE 415, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 415?
GO STUDIO is the design firm of record for SPEC SUITE 415, according to its TDLR filing.
How much does SPEC SUITE 415 cost and how big is it?
SPEC SUITE 415 has an estimated construction value of $156K, based on its TDLR filing.
๐Scope of Work
Interior renovation of existing office space in high rise building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 19, 2016
Review Complete
Inspection Complete
Closed
Jun 1, 2016