HOT TOPIC
HOT TOPIC is a renovation/alteration project at 4015 SOUTH INTERSTATE 25 Space 1015, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $60K.
๐Project Metrics
TDLR #EABPRJB6815174Project Closed
Project has been completed and closed
HOT TOPIC is a Renovation/Alteration project located at 4015 SOUTH INTERSTATE 25 Space 1015, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $60K. ARCVISION is the property owner and ARCVISION INC is the design firm of record. The project was registered with TDLR on April 26, 2016.
โFrequently Asked Questions
What is HOT TOPIC?
HOT TOPIC is a renovation/alteration project at 4015 SOUTH INTERSTATE 25 Space 1015 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior remodel to existing Hot Topic
Is HOT TOPIC open in San Marcos?
Construction on HOT TOPIC is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.
Where is HOT TOPIC located?
HOT TOPIC is located at 4015 SOUTH INTERSTATE 25 Space 1015, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of HOT TOPIC?
ARCVISION is the property owner/developer of record for HOT TOPIC, per its TDLR project registration.
Who is the architect or design firm for HOT TOPIC?
ARCVISION INC is the design firm of record for HOT TOPIC, according to its TDLR filing.
How much does HOT TOPIC cost and how big is it?
HOT TOPIC has an estimated construction value of $60K, based on its TDLR filing.
๐Scope of Work
interior remodel to existing Hot Topic
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 26, 2016
Review Complete
Inspection Complete
Closed
Jul 1, 2016
๐Related Projects
๐คSame Owner
$145.1M total๐๏ธSame Design Firm
$145.1M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump System
Express: replace 17 windows
Expedited Review - New Construction of a 2-Story Secondary Apartment [2bed 2bath]
Expedited Review - New Construction of a 2-Story Single Family Res. [3bed 3.5bath] with Habitable Attic and attached 1-car Garage
New pool