ONTAP
ONTAP is a renovation/alteration project at 200 MESQUITE ST SUITE 105, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2016). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB6815229Project Closed
Project has been completed and closed
ONTAP is a Renovation/Alteration project located at 200 MESQUITE ST SUITE 105, Arlington, TX 76011 in Arlington, Texas. The project has an estimated value of $80K. DOWN BY THE RIVERSIDE LP is the property owner and ARJO ENGINEERING is the design firm of record. The project was registered with TDLR on April 27, 2016.
โFrequently Asked Questions
What is ONTAP?
ONTAP is a renovation/alteration project at 200 MESQUITE ST SUITE 105 in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: pour concrete, build new bathroom,closet, new electricalpanel
Is ONTAP open in Arlington?
Construction on ONTAP is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2016. The building is finished and very likely open.
Where is ONTAP located?
ONTAP is located at 200 MESQUITE ST SUITE 105, Arlington, TX, 76011, in Tarrant County.
Who is the owner or developer of ONTAP?
DOWN BY THE RIVERSIDE LP is the property owner/developer of record for ONTAP, per its TDLR project registration.
Who is the architect or design firm for ONTAP?
ARJO ENGINEERING is the design firm of record for ONTAP, according to its TDLR filing.
How much does ONTAP cost and how big is it?
ONTAP has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
pour concrete, build new bathroom,closet, new electricalpanel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2016
Review Complete
Inspection Complete
Closed
Aug 1, 2016