ALDO
ALDO is a renovation/alteration project at 2200 SOUTH 10TH STREET Space PO4, Mcallen, in Hidalgo County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $110K.
๐Project Metrics
TDLR #EABPRJB6815239Project Closed
Project has been completed and closed
ALDO is a Renovation/Alteration project located at 2200 SOUTH 10TH STREET Space PO4, Mcallen, TX 78503 in Mcallen, Texas. The project has an estimated value of $110K. SIMON PROPERTY GROUP is the property owner and SHREMSHOCK ARCHITECTS INC is the design firm of record. The project was registered with TDLR on April 27, 2016.
โFrequently Asked Questions
What is ALDO?
ALDO is a renovation/alteration project at 2200 SOUTH 10TH STREET Space PO4 in Mcallen, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial remodel of the existing Aldo store.
Is ALDO open in Mcallen?
Construction on ALDO is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.
Where is ALDO located?
ALDO is located at 2200 SOUTH 10TH STREET Space PO4, Mcallen, TX, 78503, in Hidalgo County.
Who is the owner or developer of ALDO?
SIMON PROPERTY GROUP is the property owner/developer of record for ALDO, per its TDLR project registration.
Who is the architect or design firm for ALDO?
SHREMSHOCK ARCHITECTS INC is the design firm of record for ALDO, according to its TDLR filing.
How much does ALDO cost and how big is it?
ALDO has an estimated construction value of $110K, based on its TDLR filing.
๐Scope of Work
Partial remodel of the existing Aldo store.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2016
Review Complete
Inspection Complete
Closed
Jul 1, 2016