LOCAL TABLE is a renovation/alteration project at 22756 WESTHEIMER PARKWAY Suite 100, Katy, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2016). The project has an estimated value of $250K.
๐Project Metrics
TDLR #EABPRJB6815369Project Closed
Project has been completed and closed
LOCAL TABLE is a Renovation/Alteration project located at 22756 WESTHEIMER PARKWAY Suite 100, Katy, TX 77450 in Katy, Texas. The project has an estimated value of $250K. VILLAGIO INVESTMENT HOLDINGS LLC is the property owner and URBAN STUDIO DESIGN is the design firm of record. The project was registered with TDLR on April 28, 2016.
โFrequently Asked Questions
What is LOCAL TABLE?
LOCAL TABLE is a renovation/alteration project at 22756 WESTHEIMER PARKWAY Suite 100 in Katy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of a Restaurant Tenant Space in an Existing Shell Building.
Is LOCAL TABLE open in Katy?
Construction on LOCAL TABLE is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2016. The building is finished and very likely open.
Where is LOCAL TABLE located?
LOCAL TABLE is located at 22756 WESTHEIMER PARKWAY Suite 100, Katy, TX, 77450, in Harris County.
Who is the owner or developer of LOCAL TABLE?
VILLAGIO INVESTMENT HOLDINGS LLC is the property owner/developer of record for LOCAL TABLE, per its TDLR project registration.
Who is the architect or design firm for LOCAL TABLE?
URBAN STUDIO DESIGN is the design firm of record for LOCAL TABLE, according to its TDLR filing.
How much does LOCAL TABLE cost and how big is it?
LOCAL TABLE has an estimated construction value of $250K, based on its TDLR filing.
๐Scope of Work
Renovation of a Restaurant Tenant Space in an Existing Shell Building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 28, 2016
Review Complete
Inspection Complete
Closed
Jun 1, 2016