RUNWAY 7 TENANT FINISH OUT
RUNWAY 7 TENANT FINISH OUT is a renovation/alteration project at 2910 WEST LOOP 289 Suite 415, Lubbock, in Lubbock County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2016). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB6815591Project Closed
Project has been completed and closed
RUNWAY 7 TENANT FINISH OUT is a Renovation/Alteration project located at 2910 WEST LOOP 289 Suite 415, Lubbock, TX 79407 in Lubbock, Texas. The project has an estimated value of $200K. PAGOSA 2015 LLC is the property owner and WCA DESIGN STUDIO LLC is the design firm of record. The project was registered with TDLR on May 3, 2016.
โFrequently Asked Questions
What is RUNWAY 7 TENANT FINISH OUT?
RUNWAY 7 TENANT FINISH OUT is a renovation/alteration project at 2910 WEST LOOP 289 Suite 415 in Lubbock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A new tenant finish out within an existing building.
Is RUNWAY 7 TENANT FINISH OUT open in Lubbock?
Construction on RUNWAY 7 TENANT FINISH OUT is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2016. The building is finished and very likely open.
Where is RUNWAY 7 TENANT FINISH OUT located?
RUNWAY 7 TENANT FINISH OUT is located at 2910 WEST LOOP 289 Suite 415, Lubbock, TX, 79407, in Lubbock County.
Who is the owner or developer of RUNWAY 7 TENANT FINISH OUT?
PAGOSA 2015 LLC is the property owner/developer of record for RUNWAY 7 TENANT FINISH OUT, per its TDLR project registration.
Who is the architect or design firm for RUNWAY 7 TENANT FINISH OUT?
WCA DESIGN STUDIO LLC is the design firm of record for RUNWAY 7 TENANT FINISH OUT, according to its TDLR filing.
How much does RUNWAY 7 TENANT FINISH OUT cost and how big is it?
RUNWAY 7 TENANT FINISH OUT has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
A new tenant finish out within an existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 3, 2016
Review Complete
Inspection Complete
Closed
Sep 1, 2016