VISTA EQUITY-29 FLOOR PHASE 1
VISTA EQUITY-29 FLOOR PHASE 1 is a renovation/alteration project at 401 CONGRESS AVE. 29TH FLOOR, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2016). The project has an estimated value of $50K.
๐Project Metrics
TDLR #EABPRJB6816611Project Closed
Project has been completed and closed
VISTA EQUITY-29 FLOOR PHASE 1 is a Renovation/Alteration project located at 401 CONGRESS AVE. 29TH FLOOR, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $50K. ENDEAVOR REAL ESTATE GROUP is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on May 16, 2016.
โFrequently Asked Questions
What is VISTA EQUITY-29 FLOOR PHASE 1?
VISTA EQUITY-29 FLOOR PHASE 1 is a renovation/alteration project at 401 CONGRESS AVE. 29TH FLOOR in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: minor interior renovation
Is VISTA EQUITY-29 FLOOR PHASE 1 open in Austin?
Construction on VISTA EQUITY-29 FLOOR PHASE 1 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2016. The building is finished and very likely open.
Where is VISTA EQUITY-29 FLOOR PHASE 1 located?
VISTA EQUITY-29 FLOOR PHASE 1 is located at 401 CONGRESS AVE. 29TH FLOOR, Austin, TX, 78701, in Travis County.
Who is the owner or developer of VISTA EQUITY-29 FLOOR PHASE 1?
ENDEAVOR REAL ESTATE GROUP is the property owner/developer of record for VISTA EQUITY-29 FLOOR PHASE 1, per its TDLR project registration.
Who is the architect or design firm for VISTA EQUITY-29 FLOOR PHASE 1?
GENSLER is the design firm of record for VISTA EQUITY-29 FLOOR PHASE 1, according to its TDLR filing.
How much does VISTA EQUITY-29 FLOOR PHASE 1 cost and how big is it?
VISTA EQUITY-29 FLOOR PHASE 1 has an estimated construction value of $50K, based on its TDLR filing.
๐Scope of Work
minor interior renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 16, 2016
Review Complete
Inspection Complete
Closed
Jun 1, 2016
๐Related Projects
๐คSame Owner
$777.1M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Small Cell Electric Service Austin Downtown ADTC-SC13 Reference 2019-210226 SCP
Electrical service to power small cell site reference 2017 113226 SCP
2026/03/15 - 2026/03/18 | (2026/03/12) | (We order one outside 400sqft booth in SXSW2026 (show date: 12th-18th Mar) #SXSWAffiliated
bleachers with accessible ramp and deck inspection will be provided by 3rd party. bleachers to comply with ICC 300
7 row x 90 long x 4 elevated bleachers and 12x12x4 platform with 48 long ADA Ramp This Folder was Cancelled during the Automatic Add phase.
๐Related Site Plans
City of Austin site plan approvals at this location
Property Owner
Design Firm
Location Intelligence
Active businesses near this construction site
Business data from Google