REGAL HARDWOODS
REGAL HARDWOODS is a additions to existing building project at 8024 EXCHANGE suite 300, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2016). The project has an estimated value of $75K.
๐Project Metrics
TDLR #EABPRJB6818362Project Closed
Project has been completed and closed
REGAL HARDWOODS is a Additions to Existing Building project located at 8024 EXCHANGE suite 300, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $75K. INDUSTRIAL PROPERTY TRUST is the property owner and NOVE STUDIOS is the design firm of record. The project was registered with TDLR on June 10, 2016.
โFrequently Asked Questions
What is REGAL HARDWOODS?
REGAL HARDWOODS is a additions to existing building project at 8024 EXCHANGE suite 300 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: TI finihsout in existing building
Is REGAL HARDWOODS open in Austin?
Construction on REGAL HARDWOODS is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2016. The building is finished and very likely open.
Where is REGAL HARDWOODS located?
REGAL HARDWOODS is located at 8024 EXCHANGE suite 300, Austin, TX, 78754, in Travis County.
Who is the owner or developer of REGAL HARDWOODS?
INDUSTRIAL PROPERTY TRUST is the property owner/developer of record for REGAL HARDWOODS, per its TDLR project registration.
Who is the architect or design firm for REGAL HARDWOODS?
NOVE STUDIOS is the design firm of record for REGAL HARDWOODS, according to its TDLR filing.
How much does REGAL HARDWOODS cost and how big is it?
REGAL HARDWOODS has an estimated construction value of $75K, based on its TDLR filing.
๐Scope of Work
TI finihsout in existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 10, 2016
Review Complete
Inspection Complete
Closed
Aug 1, 2016
๐Related Projects
๐คSame Owner
$5.9M total๐๏ธSame Design Firm
$725K total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Install new 910.26kw rooftop solar system to existing commercial only.
Install new 910.26kw rooftop solar system to existing commercial only.
Install new 910.26kw rooftop solar system to existing commercial only.
Replacement of an existing water heater 2 50gal gas water heater changeouts
New construction of 2 story Duplex Condo each with 3 beds 2.5 baths and attached garage (8024 and 8026 bird song) - Unit A Revision 1: a 611 inspection was triggered and now it needs to be removed from multiple addresses. We need to to switch a water tap inspection from yes to not required
๐Related Site Plans
City of Austin site plan approvals at this location