AMC EAST POINT 12
AMC EAST POINT 12 is a renovation/alteration project at 8300 GATEWAY EAST Ste 200/300, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2016). The project has an estimated value of $75K.
๐Project Metrics
TDLR #EABPRJB6818906Project Closed
Project has been completed and closed
AMC EAST POINT 12 is a Renovation/Alteration project located at 8300 GATEWAY EAST Ste 200/300, El Paso, TX 79907 in El Paso, Texas. The project has an estimated value of $75K. AMERICAN MULTI-CINEMA CORP is the property owner and ARCVISION INC is the design firm of record. The project was registered with TDLR on June 17, 2016.
โFrequently Asked Questions
What is AMC EAST POINT 12?
AMC EAST POINT 12 is a renovation/alteration project at 8300 GATEWAY EAST Ste 200/300 in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior remodel to add bar kiosk into existing lobby
Is AMC EAST POINT 12 open in El Paso?
Construction on AMC EAST POINT 12 is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2016. The building is finished and very likely open.
Where is AMC EAST POINT 12 located?
AMC EAST POINT 12 is located at 8300 GATEWAY EAST Ste 200/300, El Paso, TX, 79907, in El Paso County.
Who is the owner or developer of AMC EAST POINT 12?
AMERICAN MULTI-CINEMA CORP is the property owner/developer of record for AMC EAST POINT 12, per its TDLR project registration.
Who is the architect or design firm for AMC EAST POINT 12?
ARCVISION INC is the design firm of record for AMC EAST POINT 12, according to its TDLR filing.
How much does AMC EAST POINT 12 cost and how big is it?
AMC EAST POINT 12 has an estimated construction value of $75K, based on its TDLR filing.
๐Scope of Work
interior remodel to add bar kiosk into existing lobby
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 17, 2016
Review Complete
Inspection Complete
Closed
Sep 1, 2016