BOX LUNCH
BOX LUNCH is a renovation/alteration project at 6301 NW LOOP 410 Space P04D, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2016). The project has an estimated value of $140K.
๐Project Metrics
TDLR #EABPRJB6819330Project Closed
Project has been completed and closed
BOX LUNCH is a Renovation/Alteration project located at 6301 NW LOOP 410 Space P04D, San Antonio, TX 78238 in San Antonio, Texas. The project has an estimated value of $140K. BOX LUNCH is the property owner and ARCVISION INC is the design firm of record. The project was registered with TDLR on June 23, 2016.
โFrequently Asked Questions
What is BOX LUNCH?
BOX LUNCH is a renovation/alteration project at 6301 NW LOOP 410 Space P04D in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior tenant finish to become Box Lunch store
Is BOX LUNCH open in San Antonio?
Construction on BOX LUNCH is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2016. The building is finished and very likely open.
Where is BOX LUNCH located?
BOX LUNCH is located at 6301 NW LOOP 410 Space P04D, San Antonio, TX, 78238, in Bexar County.
Who is the owner or developer of BOX LUNCH?
BOX LUNCH is the property owner/developer of record for BOX LUNCH, per its TDLR project registration.
Who is the architect or design firm for BOX LUNCH?
ARCVISION INC is the design firm of record for BOX LUNCH, according to its TDLR filing.
How much does BOX LUNCH cost and how big is it?
BOX LUNCH has an estimated construction value of $140K, based on its TDLR filing.
๐Scope of Work
interior tenant finish to become Box Lunch store
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 23, 2016
Review Complete
Inspection Complete
Closed
Sep 1, 2016