ELEVATOR NO. 5
ELEVATOR NO. 5 is a renovation/alteration project at 1401 S 4TH ST, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2017). The project has an estimated value of $150K.
๐Project Metrics
TDLR #EABPRJB6820372Project Closed
Project has been completed and closed
ELEVATOR NO. 5 is a Renovation/Alteration project located at 1401 S 4TH ST, Waco, TX 76707 in Waco, Texas. The project has an estimated value of $150K. BAYLOR UNIVERSITY is the property owner and RBDR PLLC is the design firm of record. The project was registered with TDLR on July 11, 2016.
โFrequently Asked Questions
What is ELEVATOR NO. 5?
ELEVATOR NO. 5 is a renovation/alteration project at 1401 S 4TH ST in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of a two-stop elevator to existing facilities.
Is ELEVATOR NO. 5 open in Waco?
Construction on ELEVATOR NO. 5 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2017. The building is finished and very likely open.
Where is ELEVATOR NO. 5 located?
ELEVATOR NO. 5 is located at 1401 S 4TH ST, Waco, TX, 76707, in McLennan County.
Who is the owner or developer of ELEVATOR NO. 5?
BAYLOR UNIVERSITY is the property owner/developer of record for ELEVATOR NO. 5, per its TDLR project registration.
Who is the architect or design firm for ELEVATOR NO. 5?
RBDR PLLC is the design firm of record for ELEVATOR NO. 5, according to its TDLR filing.
How much does ELEVATOR NO. 5 cost and how big is it?
ELEVATOR NO. 5 has an estimated construction value of $150K, based on its TDLR filing.
๐Scope of Work
Addition of a two-stop elevator to existing facilities.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 11, 2016
Review Complete
Inspection Complete
Closed
Dec 31, 2017